Mintra Test Online about Tanker Operations – Ship to Ship (STS)

Join Our Telegram (Seaman Community)

Welcome to the website where you can pass online the Mintra test on the subject «Tanker Operations – Ship to Ship (STS)». Practice like this will help you as a marine specialist improve your knowledge with the help of online studying and appraisal practice. Mintra based on practical information and marine specialists experience.

The Mintra Test Online about Tanker Operations – Ship to Ship (STS) covers the principles and safety requirements of ship-to-ship cargo transfer operations, including STS planning, fender selection, mooring procedures, operational responsibilities, and risk management. It also assesses knowledge of transfer sequence, weather monitoring, vessel safety, and compliance with the STS Operations Plan.

Choose the regime, in which you want to pass Mintra test:

Training - Mintra test
Training

Start test
* Some questions may have more than 1 correct answer.

“Mintra test” finished! Your result:
Correct answers:

Use the search below to find question.

Amount of questions: 15.

Right answers marked with this sign .

When selecting fenders, consideration must be given to which of the following fundamental criteria?
Under the worst operating conditions, the reaction force inflicted by the fender onto the structure of the vessel must be greater than the hull's pressure limits.
The reaction force inflicted by the fender onto the structure of the vessel must be less that the hull's pressure limit.
Under the worst operating conditions, the energy capacity of the fender must be greater that the berthing energy of the manoeuvring ship.
The energy capacity of the fender must be less than the berthing energy of the manoeuvring ship.
The Master remains responsible, at all time, for the safety of which of the following?
Luggage.
Ship.
Cargo.
Equipment.
Crew.
Which of the following actions can help to reduce the risk of incidents during STS transfers?
Selecting a high traffic area for the transfer to take place.
Constantly monitoring weather conditions.
Only carrying out operations during periods of inclement weather.
Following the requirements of the STS Operations Plan.
Selecting a suitable location for the transfer to take place.
A copy of the STS Operations Plan must be available in which of the following locations onboard?
Engine room.
Bridge.
Cargo transfer control station.
Galley.
Chain locker.
This is correct order? 1. Pre-arrival Planning; 2. Arrival; 3. Mooring; 4. Transfer of Cargo; 5. Departure.
Yes.
No.
The Master remains responsible, at all time, for the safety of which of the following?
Cargo.
Crew.
Ship.
Equipment.
Luggage.
When selecting an area for a transfer to take place, which of the following should be considered?
The availability of safe anchorage.
Traffic density.
Sea room.
Water depth.
Salinity.
Wi-fi access.
Which of the following are responsibilities of the Person in Overall Advisory Control (POAC)?
Carrying out regular safety checks before, during and after operations are complete.
Ensuring the STS Operations Plan (of both vessels) are followed.
Manually carrying out the transfer.
Ensuring that both crews have been briefed and understand their responsibilities during each phase of the operation.
Ensuring that an appropriate communication strategy is in place.
Training the crew on safe hose operation.
Which of the following details should be included within a ship's STS Operations plan?
Procedures for reporting spills.
The names of all crew onboard.
An approved contingency plan.
A description of the berthing and unberthing procedures and arrangements.
A step-by-step instruction of the entire STS Operation.
Which of the following statements is true?
Vessels intending to carry out STS operations are not required to notify authorities before operations begin.
Vessels intending to carry out STS operations must notify authorities no less than 72 hours before operations begin (or as soon as reasonably practicable following an incident).
Vessels intending to carry out STS operations must notify authorities no less than 48 hours before operations begin (or as soon as reasonably practicable following an incident).
Which sequence is correct?
Pre-arrival Planning - Arrival - Mooring - Transfer of Cargo - Departure.
Pre-arrival Planning - Arrival - Transfer of Cargo - Mooring - Departure.
Departure - Pre-arrival Planning - Arrival - Transfer of Cargo - Mooring.
STS notices must include which of the following?
Whether the transfer will take place at anchor or underway.
The departure port of both vessels.
The name, flag, call sign, IMO Number and estimated time of arrival of all vessels involved.
Identification and contact details of the Chief Steward.
Planned duration of the operation.
The cargo type and quantity.
Ship to ship transfer is regulated by which of the following pieces of legislation?
The International Convention for the Prevention of Pollution from Ships (MARPOL).
The International Convention on Standards of Training, Certification and Watchkeeping for Seafarers (STCW).
The The Maritime Labour Convention (MLC).
To carry out safe STS transfer operations, personnel involved in the transfer must be fully trained and competent in all areas of the operation.
True.
False.
Ship to Ship (STS) transfer (or lightering) is the transfer of cargo between two vessels.
True.
False.

Did you find mistake? Highlight and press CTRL+Enter

Verified by
Vladimir Filatov
Chief Officer
About

Senior Mate with 12+ years of experience in the international merchant marine.

  • Development and implementation of navigation and on-board safety plans.
  • Supervising the work of the crew and assisting the captain in managing the vessel.
  • Participation in training of junior crew, ensuring compliance with safety standards.

All materials have been checked by our marine expert.