.
🔥 Get CES, CBT Test Answers in PDF!
Site categories
1/ Help
:

Crew Evaluation System CBT Test Online about RAST_WIN (CD Module 0086)

Join Our Telegram (Seaman Community)

Welcome to the website where you can pass online the CBT test on the subject «RAST_WIN (CD Module 0086)». Practice like this will help you as a marine specialist improve your knowledge with the help of online studying and appraisal practice. CBT based on practical information and marine specialists experience.

CBT tests developed for evaluating seaman basic knowledge by Seagull Company (rebranded as «OTG»), is an evaluating online-tool, used for revealing any professional preparation needed in specific fields of knowledge, defined by STCW.

CBT tests have proven themselves as good tools for the selection and recruitment process, as well as advancing the level of knowledge of the current officers and crew. Ocean Technologies Group use various subjects for question creation, which includes:

  • Crowd and Crisis Management;
  • Integrated Navigation System (INS);
  • Ballast water management;
  • Handling and Stowage;
  • Vessel operation management and safety;
  • Marine engineering;
  • Maintenance and repair, etc.

Current test contains Seagull CBT questions on the subject «RAST_WIN». Those questions can be used for competence verification specialist capable of preventing accidental situations related with transporting safety, or also for self-examination.

«RAST_WIN» subject includes theoretical and practical information about advanced training for work on any type of vessel. The test evaluates comprehensive knowledge of helicopter rescue and transfer operations for maritime personnel working on all vessel types. It includes multiple-choice questions on system components, operational limits and safety procedures during crew transfer operations in various sea conditions. Candidates must demonstrate understanding of SOLAS and IMO regulations related to personnel transfer systems and emergency evacuation protocols. Scenario-based questions assess decision-making during transfer operations, including risk assessment, weather limitations and emergency abort procedures. Practical components test the ability to operate RAST equipment, including harness connection, winch controls and communication procedures. The exam covers vessel-specific factors affecting operations, such as deck layout, ship motion compensation and recovery zone preparation. Questions on emergency situations evaluate response to equipment failures, personnel injuries, or adverse weather during transfer operations. Successful completion certifies competence in helicopter-vessel operations, enhancing crew safety during personnel transfers in offshore environments.

On this site Crew Evaluation System Test on the subject «RAST_WIN (CD Module 0086)» contains 34 questions you need to answer with no possibility to go back to previous question. Therefore, we recommend carefully reading each question and making decision with no hurry. In case you have some difficulty answering, you have also possibility to request a hint.

The test includes two modes. In the Training mode, you go through 34 questions with the option to take a hint, while in the Exam mode, this option is not available. Enjoy!

Choose the regime, in which you want to pass CES test:

Start test
* Some questions may have more than 1 correct answer.

“CBT test” finished! Your result:
Correct answers:

Use the search below to find question.

Amount of questions: 34.

Right answers marked with this sign .

How do we establish a new project?
By opening the project list and then clicking on the new button.
By selecting an existing project.
By importing a project template.
By creating a project from scratch.
What do PMS stand for?
PMS stands for Performance Management System.
PMS stands for Planned Maintenance System.
PMS stands for Project Management Software.
PMS stands for Preventive Maintenance Schedule.
What is the master’s responsibilities regarding SMS?
The master’s responsibilities in the SMS is to implement the SMS and motivate officers and crew in use and improve of the PMS.
The master’s responsibilities include only reporting incidents.
The master’s responsibilities are limited to navigation safety.
The master’s responsibilities do not include crew training.
How do we open the technical account sub module in RAST Win?
We open it by selecting the account from a dropdown menu.
We open it by navigating through the settings menu.
We open the technical account sub module in RAST Win by clicking on the technical account button or click on technical account under main module technical description.
We open it by entering a command in the command line.
For what purpose do we have resource management in RAST Win?
To get a cost and quality plan with man-hours on all the jobs onboard.
To track inventory levels.
To manage crew schedules.
To analyze fuel consumption.
When do we create work request?
We create work request for emergency repairs.
We create work request for routine maintenance.
We create work request for all planned jobs.
We create work request for jobs not covered by the PMS.
What is the minimum requirement regarding PMS?
The minimum requirement for a PMS is that it must contain all class related machinery items and automation equipment covered by the rule.
The minimum requirement is to include only safety equipment.
The minimum requirement is to cover only engine room machinery.
The minimum requirement is to have a maintenance schedule for crew training.
Is it possible to create a monthly budget in RAST Win?
Budgets can only be set to annual periods.
Budgets can be set to weekly, monthly, and quarterly periods.
Budgets can only be set to daily periods.
Budgets cannot be created in RAST Win.
What does ISM Code stand for?
ISM Code stands for the International Ship Management Code.
ISM Code stands for the International Safety Measure Code.
ISM Code stands for the International Safety Management Code.
ISM Code stands for the Integrated Safety Management Code.
Is it possible to connect spare parts from the installed equipment list to a PO?
It is possible to connect spare parts from an installed equipment list to a PO.
It is not possible to connect spare parts to a PO.
Spare parts can only be connected to a maintenance request.
Spare parts can only be ordered separately.
What is the main purpose of the store list?
The main purpose is to track expired items.
The main purpose of the store list is to update stock with the correct amounts and location of parts.
The main purpose is to manage supplier contacts.
The main purpose is to list all available tools.
Do we build up the plan of technical accounts in RAST Win hierarchy?
The plan of technical accounts in RAST Win is built up in a hierarchy.
The plan is built randomly without any structure.
The plan is built only for specific projects.
The plan is not structured in RAST Win.
Can we create а PO directly from а PO template?
A PO cannot be created from a PO template.
A PO can only be created manually.
A PO template is not necessary for creating a PO.
A РО can be created directly from the PO template.
How do we establish a new project?
By opening the project list and then clicking on the new button.
By sending an email to the project manager.
By creating a new document in the system.
By discussing it in a team meeting.
Is it possible to create а split PO for sending the PO to different vendors?
Split POs are not allowed in the system.
A single PO can only be sent to one vendor.
It is not possible to modify a PO once created.
We can split PO‘s to send it to different vendors.
In which module do we find standard texts for the company?
We find the standard texts in the supplementary module.
Standard texts are located in the finance module.
The standard texts can be found in the HR module.
There is no specific module for standard texts.
Who is creating new and updating most of the sub modules in the supplementary module?
External consultants handle the updates for the sub modules.
Only the IT department is responsible for creating new sub modules.
The users create and update the sub modules themselves.
The company creates new and updates most of the sub modules in the supplementary module.
Why do we have equipment list in RAST Win?
We have equipment list in RAST Win to identify each individual equipment as main engine cover.
The equipment list is used for inventory management only.
It serves as a checklist for maintenance tasks.
The list is for tracking equipment usage statistics.
To which lists in RAST Win do we normally connect addresses?
Addresses are only connected to purchase orders.
Addresses are linked solely to equipment lists.
Addresses are not connected to any lists in RAST Win.
We normally link addresses to technical account, equipment, spare parts, purchase orders and invoices.
Do we report completed jobs in the project module?
Completed jobs must be reported in the work done module and not in the project module.
Completed jobs are reported directly in the project module.
There is no specific module for reporting completed jobs.
Completed jobs can be reported in both modules.
What do we normally update in the RAST Win‘s project module?
We update only financial data in the project module.
The project module is used for updating client information.
We do not update anything in the project module.
The project module is used mostly for updating material issuing and man-hours.
What does SMS stand for?
SMS stands for Safety Management System.
SMS stands for Standard Messaging Service.
SMS stands for Secure Management System.
SMS stands for Systematic Monitoring Service.
From which sub menu do we normally connect items from when creating spares?
Items are connected from the inventory sub-module.
We connect items from the purchase orders sub-module.
We normally connect items from the sub-module material list.
Items are linked from the equipment sub-module.
Is it possible to copy one project into a new project?
Yes, we can copy activities from existing project and use old activities numbers or create new numbers.
It is not possible to copy projects in the system.
Projects can only be duplicated with the same activity numbers.
We can only create new projects from scratch.
Are all scheduled jobs connected to a technical account?
Only some scheduled jobs are connected to technical accounts.
Scheduled jobs do not require a connection to technical accounts.
Technical accounts are only used for financial reporting.
Yes, all scheduled jobs are connected to the technical accounts.
What do we mean with standard jobs in RAST Win?
Standard jobs are all the jobs that are in the RAST Win system and they can be connected either to technical account or to equipment.
Standard jobs refer only to maintenance tasks.
Standard jobs are jobs that do not require any documentation.
Standard jobs are only applicable to specific projects.
What is the main purpose of the workflow?
The workflow is primarily used for tracking project timelines.
The main purpose of the workflow is to manage financial transactions.
Workflows are only used for employee performance evaluations.
The main purpose of the workflow is to serve as a tool for routing tasks such as work requests, work orders and purchase orders.
How do we open the active purchase order list in RAST Win?
We open the active purchase order list in RAST Win by clicking on PO‘s under purchase module.
The active purchase order list is accessed through the reports section.
We can find the active purchase order list in the settings menu.
The active purchase order list is opened by searching for specific orders.
What basic information is contained in the employee list?
The employee list only contains names and contact information.
The basic information included is their full name, resource, grade, certificates and date the employee was hired.
It includes only the job titles and departments of employees.
The employee list contains performance reviews and salary details.
What is the purpose of the project module?
The project module is for planning activities during docking, port calls etc.
The project module is used for financial reporting.
It serves as a database for employee information.
The project module is primarily for tracking inventory.
What do we use to identify the individual functions and locations in RAST Win?
We identify functions and locations using the employee list.
A project timeline is used for identifying functions and locations.
We use a plan of technical account to identify the individual functions and locations in RAST Win.
We use the inventory list to identify functions and locations.
Are the documents you find in the document module only documents generated by the RAST Win?
Documents in the document module are either addressed to a manual or electronic filing system.
The document module only contains reports generated by RAST Win.
Only contracts and agreements are stored in the document module.
The document module is exclusively for internal documents.
How many workflow addresses can one user be connected to?
A user can be connected to multiple workflow addresses simultaneously.
Users are not allowed to share workflow addresses.
Each user must have a unique workflow address.
Each user can only be connected to one workflow address, but the user can share the workflow address with other users.
How is it possible to receive class credit for а CMS item with а maintenance interval that exceeds 5 years?
We can receive class credit for a CMS item with maintenance interval exceeding 5 years if satisfactory maintenance history is documented.
Class credit is automatically granted for all CMS items regardless of maintenance history.
A CMS item must have a maintenance interval of 3 years or less to receive class credit.
Class credit can only be received if the item is replaced within 5 years.

Did you find mistake? Highlight and press CTRL+Enter

Август, 19, 2025 209 0
5/5 - (1 голос)
SOC.MEDIA Telegram Vkontakte Facebook Odnoklassniki Instagram
Add a comment